Office & Commercial
Airbus HQ - Stevenage
DETAILED DESIGN AND MANAGEMENT OF MECHANICAL, ELECTRICAL AND PUBLIC HEALTH SERVICES
New build 9,800 m2 HQ offices
Services include:
Detailed 'real world' energy studies to advise design solutions,
HVRF heating and cooling system,
Mechanical Ventilation with VAV and heat recovery,
Organic Response Lighting Controls,
MER and SER rooms with close control air conditioning,
Links to site wide CCTV/Access control and Data systems,
Standby Power systems to build resilience
BIM collaboration including BIM Level 2 3D Revit model with clash detection and MagiCAD design.
AB Agri Offices, Peterborough
DETAILED DESIGN AND MANAGEMENT OF MECHANICAL, ELECTRICAL AND PUBLIC HEALTH SERVICES
Phase 1 2565m2 new build offices.
Phase 2 1845m2 of additional office, meeting spaces, welfare facilities along with a cafe area.
Services include:
Mechanical heat recovery ventilation to offices and core areas.
VRV heat recovery heating and cooling system,
Client cat B fitout works,
Rainwater harvesting
Advanced lighting controls.
EPC A rating
CCL Phase 6AB & 7A
DETAILED DESIGN AND MANAGEMENT OF MECHANICAL, ELECTRICAL AND PUBLIC HEALTH SERVICES
Building 6 A&B - 4300m2 new build offices, technical laboratories and links to existing buildings, 4 pipe fan coil units with free cooling chiller installation and link to energy centre
Building 7 - 3700m2 new build offices, technical laboratories, server room, breakout spaces, kitchen & canteen, rooftop client hospitality facility with roof garden.
Services include:
Biomass boiler
Raised floor for busbar power distribution
Design allows for future flexibility and remodelling of office spaces
EMC and Optic laboratories
PV installation
Feature lighting to canteen and entrance.
Laboratory systems including laboratory gases and fume cupboard ventilation .
Uninterruptible power systems and standby generation.
Displacement ventilation to 3 storey canteen.